The City of Rockingham has released a flythrough video of what the Aqua Jetty will look like after its Stage Two major refurbishment.
Stage two will include the development of a wellness suite including a larger hydrotherapy pool, along with sauna, and steam rooms.
There are three adult change facilities proposed throughout the facility as well as a number of universal accessible toilets and family change facilities.
An expanded ‘learn to swim pool’ will be developed, which will help in alleviating the demand on other water spaces at the facility.
The leisure pool will also be redesigned to accommodate a new interactive splash pad and water play areas, and the water slide area will also be redesigned and expanded.
A larger gymnasium and group fitness spaces are a key part of the concept design.
The café, crèche and reception will be relocated to the front of the building, with more car parks being included in the design process.
Construction is expected to begin mid-2023.
The flythrough video is an indicative representation of the design of the Aqua Jetty Stage 2 project.
The final product may differ.
18-year-old male from Lakelands charged over firearm incident in Pinjarra
BREAKING: Reports of a man armed with a firearm in the Pinjarra area
Hayden Ballantyne signs with Rockingham Rams
Mayor reassures community that 'no decision has been made' to close 4WD access at Tim's Thicket, White Hills beaches
DBCA 'sick and tired' of illegal access to Port Kennedy Scientific Park
Mandurah homeless camp goes up in flames
Dawesville community shocked after kangaroo deliberately mowed down
Teens armed with knife, scooter charged over Rockingham Shopping Centre fight
Mandurah private school teacher charged with alleged sexual abuse of male student